Kogeneracijsko postrojenje Capstone C1000 + APROVISCapstone
C1000
Kogeneracijsko postrojenje Capstone C1000 + APROVIS
Capstone
C1000
Godina proizvodnje
2015
Stanje
Polovno
Lokacija
Laško 

Osnovni podaci
- Naziv mašine:
- Kogeneracijsko postrojenje Capstone C1000 + APROVIS
- Proizvođač:
- Capstone
- Model:
- C1000
- Godina proizvodnje:
- 2015
- Stanje:
- polovno
- Radni sati:
- 50.000 h
Cijena i lokacija
- Lokacija:
- Laško, Slovenija

Pozovite
Tehnički detalji
Motor i mjenjač
Gorivo:
kućni plin H
Detalji o snazi
Ulazni napon:
400 V
Ulazna frekvencija:
50 Hz
Ulazna struja:
1.444 A
Vrsta ulazne struje:
trofazni
Dokumentacija i certifikacija
Dokumentacija / priručnik
Hlađenje
Tip hlađenja:
zrak
Daljnje pojedinosti
Nazivna (prividna) snaga:
999 kVA
Maksimalna brzina okretanja:
60.000 okret/min
Detalji ponude
- ID oglasa:
- A22903560
- Referentni broj:
- SPTE-C1000
- Ažuriranje:
- posljednji put 08.10.2026
Opis
Used natural gas-fired combined heat and power plant for electricity and industrial steam production.
Main equipment:
• Capstone C1000: five C200 microturbine modules, each rated at 200 kW; electrical output of the complete package: 999 kWe; 400 V / 50 Hz; grid-parallel operation; common acoustic enclosure and control system.
• APROVIS waste heat steam boiler: rated production of 2,000 kg/h of saturated steam at 6 bar(g); maximum allowable pressure 9 bar(g); equipped with two economizer stages for heat recovery.
Dwodpfx Acjz I T Ekeijc
• Reinhard Simon CKO501G supplementary duct burner: 500 kW, for additional exhaust gas heating upstream of the boiler.
• BIO-KOMP fuel gas booster compressor: 30 kW, maximum flow 340 Nm³/h, discharge pressure 6 bar(g).
The plant has been regularly maintained under a maintenance contract, with components replaced in accordance with the maintenance schedule. One of the five turbine modules is currently non-operational.
Operating hours: T1: 53,191 h; T2: 50,891 h; T3: 51,628 h; T4: 52,691 h; T5: 49,487 h.
The pressure equipment has an inspection certificate issued by an accredited pressure equipment inspection body. Technical documentation is available. Inspection, price and collection terms are subject to agreement.
Oglas je automatski preveden. Moguće su greške u prijevodu.
Main equipment:
• Capstone C1000: five C200 microturbine modules, each rated at 200 kW; electrical output of the complete package: 999 kWe; 400 V / 50 Hz; grid-parallel operation; common acoustic enclosure and control system.
• APROVIS waste heat steam boiler: rated production of 2,000 kg/h of saturated steam at 6 bar(g); maximum allowable pressure 9 bar(g); equipped with two economizer stages for heat recovery.
Dwodpfx Acjz I T Ekeijc
• Reinhard Simon CKO501G supplementary duct burner: 500 kW, for additional exhaust gas heating upstream of the boiler.
• BIO-KOMP fuel gas booster compressor: 30 kW, maximum flow 340 Nm³/h, discharge pressure 6 bar(g).
The plant has been regularly maintained under a maintenance contract, with components replaced in accordance with the maintenance schedule. One of the five turbine modules is currently non-operational.
Operating hours: T1: 53,191 h; T2: 50,891 h; T3: 51,628 h; T4: 52,691 h; T5: 49,487 h.
The pressure equipment has an inspection certificate issued by an accredited pressure equipment inspection body. Technical documentation is available. Inspection, price and collection terms are subject to agreement.
Oglas je automatski preveden. Moguće su greške u prijevodu.
Dobavljač
Napomena: Registrujte se besplatno ili prijavite, za pristup svim informacijama.
Posljednji put online: prošle sedmice
Registriran od: 2025
2 Oglasi online
Pošaljite upit
Telefon & Faks
+386 51 2... oglasi
Vaš oglas je uspješno izbrisan
Došlo je do greške
















