Čista SOBA ISO 8
Čista SOBA ISO 8
EXW VB plus PDV
50.000 €
Godina proizvodnje
2020
Stanje
Polovno
(potpuno funkcionalan)
Lokacija
Łódź 

Osnovni podaci
- Naziv mašine:
- Čista SOBA ISO 8
- Godina proizvodnje:
- 2020
- Stanje:
- vrlo dobro (rabljeno)
- Funkcionalnost:
- potpuno funkcionalan
Cijena i lokacija
EXW VB plus PDV
50.000 €
- Lokacija:
- Łódź, Poljska

Pozovite
Detalji ponude
- ID oglasa:
- A14477200
- Ažuriranje:
- posljednji put 02.01.2024
Opis
CLEANROOM - ISO 8
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Njdpfx Asq H H Rujfzjdc
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
Oglas je automatski preveden. Moguće su greške u prijevodu.
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Njdpfx Asq H H Rujfzjdc
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
Oglas je automatski preveden. Moguće su greške u prijevodu.
Dobavljač
Napomena: Registrujte se besplatno ili prijavite, za pristup svim informacijama.
Registriran od: 2023
1 Oglas online
Pošaljite upit
Telefon & Faks
+48 728 4... oglasi
Ovi oglasi bi vas također mogli zanimati.
Uspješno
Vaša poruka je poslana.
Aukcija
Završava za
d
h
min
s
Aukcija završena
Województwo podlaskie
1.104 km
Visokotemperaturna vakuumska peć
PVA TePlaCOV 733 RS
PVA TePlaCOV 733 RS
Uspješno
Vaša poruka je poslana.
Mali oglas
Njemačka
972 km
Vertikalni obradni centar
CMSARES 3626
CMSARES 3626
Uspješno
Vaša poruka je poslana.
Aukcija
Završava za
d
h
min
s
Aukcija završena
Saarland
1.018 km
Laser rezačica
TRUMPFTruLaser 2030 Fiber
TRUMPFTruLaser 2030 Fiber
Uspješno
Vaša poruka je poslana.
Aukcija
Završava za
d
h
min
s
Aukcija završena
Bayern
692 km
S+UVV 03/27 Elektro 6.200 h
LindeD 12HPSP
LindeD 12HPSP
Uspješno
Vaša poruka je poslana.
Mali oglas
España
1.803 km
Koekstruzija puhanih filmova sa 7 slojeva
Macchi7 capas
Macchi7 capas
Uspješno
Vaša poruka je poslana.
Aukcija
Završava za
d
h
min
s
Aukcija završena
Bayern
692 km
2x baterija + punjač 2022 Linde MT12 MT15
Linde48V
Linde48V
Uspješno
Vaša poruka je poslana.
Aukcija
Završava za
d
h
min
s
Aukcija završena
Bayern
692 km
2019 servis + UVV 07/2027 Linde P50
LindeP50
LindeP50
Uspješno
Vaša poruka je poslana.
Mali oglas
Weert
1.214 km
Revidirani industrijski robot + garancija
KUKAKR210 R3100 ultra KRC4
KUKAKR210 R3100 ultra KRC4
Uspješno
Vaša poruka je poslana.
Aukcija
Završava za
d
h
min
s
Aukcija završena
Bayern
692 km
2020 FEM3 40-180 cm Linde H50D rotator
LindeSwivel Clamp
LindeSwivel Clamp
Uspješno
Vaša poruka je poslana.
Aukcija
Završava za
d
h
min
s
Aukcija završena
Bayern
692 km
2019 S+UVV 09/2027 Still EXU-SF20
StillEXU-SF20
StillEXU-SF20
Uspješno
Vaša poruka je poslana.
Mali oglas
Wuppertal
1.135 km
Spotting press
HESSMERT160 EST
HESSMERT160 EST
Uspješno
Vaša poruka je poslana.
Aukcija
Završava za
d
h
min
s
Aukcija završena
Bayern
692 km
44/2023 Servis + UVV 03/2027 Linde D12H
LindeD12 HP SP
LindeD12 HP SP
Uspješno
Vaša poruka je poslana.
Aukcija
Završava za
d
h
min
s
Aukcija završena
Bayern
692 km
44/2023 Servis + UVV 03/2027 Linde D12H
LindeD12 HP SP
LindeD12 HP SP
Uspješno
Vaša poruka je poslana.
Mali oglas
Njemačka
972 km
Metalni 3D printer
Nikon SLM SolutionsSLM280 2.0 Single 700W
Nikon SLM SolutionsSLM280 2.0 Single 700W
Uspješno
Vaša poruka je poslana.
Aukcija
Završava za
d
h
min
s
Aukcija završena
Bayern
692 km
2019 servis + UVV do 09/2027 Still RX20-18
StillRX20-18
StillRX20-18
Vaš oglas je uspješno izbrisan
Došlo je do greške














































































































































































































































